Skip to main content
The website is currently being completed
HTBM/Solutions/Thickening
Process challenge & technology

Thickening

HTBM supports the journey from survey, technology selection and solution design to equipment supply, installation, operation and after-sales service.

Process flowsheet

Thickening

Thickening
Standard metallurgical process
Input data

Plant design engineering parameters

ISO 10628 · HTBM Verified Boundary
Material / mineralThickening
Hardness / propertiesBond Wi: 12 – 18 kWh/t
Feed size0 – 400 mm (Feed bin sizing)
Design capacity80 – 600 t/h (Modular line)
Target product qualityCommercial export grade
Target recoveryOptimized closed circuit
Installation environmentMineral processing complex
Product Moisture≤ 9% (High pressure filtration)
Process flowsheet

Process flowsheet

Standard technical parameters referenced by HTBM equipment model range. Actual plant configuration is engineered against ore testwork results and process flowsheet.

HTBM supports the journey from survey, technology selection and solution design to equipment supply, installation, operation and after-sales service.

ENGINEERING FLOWSHEET / PROCESS FLOW DIAGRAM (PFD)
STAGE 01 OF 07FEED-01
Kiểm toán công đoạn 01FEED-01

Raw ore / feed

Confirm sample characteristics, moisture and feed size.

Controlled outputMaterial data sheet
Chỉ tiêu khối lượng & cỡ hạt công đoạn
Equipment familySampling · feeding
Tổ hợp máy chế biến theo tiêu chuẩn HTBM
Điểm kiểm soát kỹ thuậtMass Balance & Throughput Stability
Được chuẩn hóa dựa trên kết quả testwork mẫu quặng
Equipment selection logic

Equipment family mapping

View equipment family
Engineering audit checks

Critical engineering control points

01

Ore sample characterization (Bond Work Index, Abrasion index Ai, specific gravity testwork)

02

Mass balance simulation & circulating load calculation for grinding-classification circuit

03

Separation recovery verification (magnetic / flotation) and tailings filter-cake moisture audit

Field case evidence

Related projects

Related projects
Case study

Iron ore crushing and beneficiation line

Dong Nai · Vietnam · Iron ore / hematite

Related projects
Case study

Crushing and screening plant for aggregates

Dong Thap · Vietnam · Construction aggregate

Related projects
Lifecycle roadmap

Bring your process challenge to the technical desk

Share material, feed size, capacity, location and product goals. HTBM will start from the real input data.

Pre-feasibility engineering audit within 48h
Flowsheet mass balance simulation & sizing

Material & process parameters

Contact person & dossier

Upload deposit layout or testwork results(PDF, DOC, DOCX, JPG, PNG < 10MB)

HTBM metallurgical & equipment engineers will contact you directly.